Building InspectionsBuilding Inspections<table width="100%" class="ms-rteTable-2" cellspacing="0"><tbody><tr class="ms-rteTableHeaderRow-2"><th class="ms-rteTableHeaderEvenCol-2" rowspan="1" colspan="1" style="width:50%;">​Physical Address</th><th class="ms-rteTableHeaderOddCol-2" rowspan="1" colspan="1" style="width:50%;">​Mailing Address</th></tr><tr class="ms-rteTableOddRow-2"><td class="ms-rteTableEvenCol-2" style="width:50%;"><p>​110 North Green Street<br>Morganton, NC 28655</p></td><td class="ms-rteTableOddCol-2" style="width:50%;">​PO Box 219<br>Morganton, NC 28680-0219</td></tr><tr class="ms-rteTableEvenRow-2"><td class="ms-rteTableEvenCol-2" rowspan="1" style="width:50%;">​Phone: (828) 764-9020</td><td class="ms-rteTableOddCol-2" rowspan="1" style="width:50%;">​Fax: (828) 764-9021</td></tr></tbody></table><p> </p><h1>Staff</h1><p><a href="mailto:steve.holden@burkenc.org">Stephen Holden</a>, Chief Bldg Inspector<br><a href="mailto:kevin.flynn@burkenc.org">Kevin Flynn</a><br><a href="mailto:peter.schichtel@burkenc.org">Peter Schichtel</a></p><h1>Inspector Hours</h1><p>In office from 7:00 AM until 8:00 AM<br>In the field from 8:00AM to 4:00 PM.   <br>If you need to speak to an inspector concerning Code Related Questions you may call the main office and be transferred to the inspector's cellular phone in the field.</p><h1>Office Hours</h1><p>Monday-Friday, 8:00 AM- 5:00 PM<br> <br><strong>Call main office line to schedule inspections</strong>.  Inspections will be scheduled for the next day when possible but may be scheduled two days later depending on availability of inspectors. </p><p>Applications may be downloaded here or picked up in our office.  </p><p>All commercial applications are <span style="background-color:#ffffff;">required</span> to be dropped off for review.  A plan review fee is required when the application is applied for (see fee schedule for costs).  All commercial plans require drawings to explain type of work.  Applications will not be accepted without proper plans.  Any commercial building over 2500 sq. ft. in size will require a design professional to provide drawings.  This includes but not limited to change of use, addition, remodel or new construction.  This will also apply to trade work. </p>

 

 

NCDOIhttp://www.ncdoi.com/, NCDOI NCDOI

 

 

Commercial Permit Applicationhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/COMMERCIAL_PERMIT_APPLICATION.pdfCommercial Permit Application
Small Appendix B Formhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/SMALL_APPENDIX_B_FORM.pdfSmall Appendix B Form
Sub Permit Appllicationhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/SUB_PERMIT_APPLICATION.pdfSub Permit Appllication
Residential Temp Power Formhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/RESIDENTIAL_TEMP._POWER_FORM.pdfResidential Temp Power Form
Commercial Checklisthttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/COMMERCIAL_CHECKLIST.pdfCommercial Checklist
Sub Verification Formhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/SUB VERIFICATION FORM.pdfSub Verification Form
Mobile Home Permit Applicationhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/MOBILE_HOME_PERMIT_APPLICATION.pdfMobile Home Permit Application
Homeowner Execmption Formhttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/HOMEOWNER_EXEMPTION_FORM.pdfHomeowner Execmption Form
Residential Checklisthttp://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/RESIDENTIAL_CHECKLIST.pdfResidential Checklist
Construction Cost (per Sq. Foot)http://www.burkenc.org/assets/Published Documents/Departments/Community Development/Building Inspections/Fee_sq._ft._construction_cost.pdfConstruction Cost (per Sq. Foot)